The gap gets paid later, and it gets paid more.

A tender is returned in a few weeks. A capital project is committed against a budget set long before the first cubic metre moves. In both cases the decision comes before the real cost, and the gap resurfaces later, as variations, as rework, or as a bid lost. Place Maker works on that exact moment, on both sides of the contract, on scopes reaching EUR 50.3 m.

EUR 50.3 mlargest single operation directed
25 yearsdirecting heavy civil works across four continents
EUR 29.3 mdirected under owner mandate, two portfolios
25people deployed on site, four engineers reporting
Diagnosis

Three gaps that are never visible at the moment they are created

None of the three is hidden. Each one simply escaped the count, because it carries the name of no bill of quantities item. On a remote site each one is then measured in weeks, not in hours. They are given here with the test that finds them, on your own package, today.

Coactivity, the item with no line to sit on

Two contractors on the same footprint in the same week: a crew waits half a day for access to clear. Nobody logs it, because it is not an incident, it is organisation. Added up across a multi package site, those hours were priced by no one, and they return as a claim for standing time or as an extension of time.

The cross cutting item nobody owns

On one infrastructure package reviewed, stormwater management alone carried close to a third of the design effort, sitting under half a line of the brief. The test: excavated material, traffic maintenance, reinstatement of private connections. For each, which package owns it, and who priced it?

The time you never bounded

The contractor holds firm dates backed by liquidated damages. The client holds an implicit date, which is to say none. The test: find, in your last contract, the line that fixes your own approval time. On a nine month programme, bounding it recovered a month.

Method

How it works

  1. 1

    You send the documents

    The tender package, or the scope of your operation. No prior formatting is required.

  2. 2

    Scoping response within 24 hours

    What has to be produced, on which packages, within what deadline, and what the file is missing before pricing is possible. Scope and fee fixed before any start.

  3. 3

    Production

    Line by line cost study, technical submission, or the quality documents of the assurance engagement. Every quantity traced back to its source.

  4. 4

    Delivery and follow up

    Deliverables come with their assumptions in writing. Revisions are included until approval, within the agreed scope.

Evidence

Two operations that set the standard

Delegated client role and QA-QC

Acid water containment, Koniambo mining site

Client
Glencore KNS
Role
project and quality manager, capital works
Value
EUR 11.7 m, being XPF 1.4 bn
Period
successive operations, 2014 to 2024
Location
New Caledonia

Major earthworks, HDPE geomembrane installation for leachate containment, multi trade technical buildings covering civil works, air conditioning, high and low voltage systems and instrumentation.

Role held: Tender documents, bid analysis, subcontractor award, quality plans with inspection and test plans, hold points and non conformity registers, progress management by earned value.

Outcome: Commissioning completed and transfer into operation. Entry into service evidences delivery.

Client advisory, appointed agent

Public bridge and culvert works, Canala, Houailou, Koumac

Appointed by
SEMVKP, on behalf of public authorities
Portfolio
EUR 17.6 m, being XPF 2.1 bn
Period
engagements between 2014 and 2024
Location
New Caledonia

Composite bridges in high performance concrete and steel, deep foundations, road diversions and technical platforms, on sites far from logistics bases.

Role held: The complete chain: programming, tender documents, contract award, contract supervision, handover, as built documentation. Coordination between the geotechnical engineer, the inspection body and the contractors.

Outcome: Structures handed over, snag lists cleared, as built files compiled and checked. Operations directed in full autonomy.

Euro amounts are converted at the fixed parity of the Pacific franc, 1 euro to 119.3317 XPF. Certificates and values itemised operation by operation are provided on request.

Have it read before you commit

A first conversation, a review of your tender or your operation, then a written priced proposal. The first response comes within 24 working hours.